Creepage and Clearance: The Two Distances That Decide Certification

Most transformer designs that fail a safety certification do not fail on performance. They fail on a distance: the gap along the surface of the bobbin or the air distance between the primary winding and the secondary winding is a fraction of a millimetre short of the requirement.

This guide explains the difference between creepage and clearance, how the numbers are derived from the standard, and the construction techniques that reliably meet reinforced insulation without inflating the component size.

Definitions

Both must be satisfied at every point of the insulation barrier, including the winding ends, the pin-to-winding connections, the tape margins and the core itself if it is not earthed.

How the Required Values Are Derived

Under IEC 62368-1 (and its predecessors IEC 60950-1 / 60065), the required distances depend on four inputs:

  1. Working voltage — RMS and peak, plus the transient category for clearance.
  2. Pollution degree — PD1 (sealed, potted), PD2 (normal indoor, the usual default), PD3 (industrial, conductive dust or condensation).
  3. Material group — determined by the comparative tracking index (CTI) of the bobbin material: group I ≥ 600 V, group II 400–599 V, group IIIa 175–399 V.
  4. Insulation type — functional, basic, supplementary or reinforced. Reinforced is the sum of basic plus supplementary and is what separates mains from an accessible secondary.

Indicative values for a 250 V RMS mains input, PD2, material group IIIa (a typical PBT-GF30 bobbin), 50/60 Hz:

Insulation Clearance (mm) Creepage (mm)
Functional 0.5–1.0 1.0–1.5
Basic 1.5–2.0 2.5–3.2
Supplementary 1.5–2.0 2.5–3.2
Reinforced 3.0–4.0 5.0–6.4

These are typical values for orientation, not substitutes for the table in your applicable standard. Switching-supply designs must also consider the working voltage across the barrier, which for a 230 V mains flyback can exceed 400 V peak, and the relevant table entry rises accordingly.

Construction Techniques That Work

Bobbin design

Winding technique

Core and assembly

Verification

Certification laboratories measure both distances on the actual sample with a pin gauge and a calliper, at the worst-case point, and then apply the tests: dielectric withstand, insulation resistance after humidity conditioning, and for reinforced insulation a partial-discharge check. Build the measurement into your own first-article inspection: a 5-minute check on the first unit of each batch catches bobbin tooling wear before it becomes a certificate problem.

Typical Failure Points

Location Failure mode Fix
Winding start pin Wire crosses the margin tape corner Add end tape; route the start turn inside the bay
Bobbin pin exit Creepage path is a straight line along the moulding Creepage slot or a moulded rib
Core-to-winding Core not earthed but treated as safe Earth the core or add insulation tape rated for reinforced
Between two secondaries Assumed functional only Check the actual circuit potential and required insulation level
PCB interface Distances OK inside the transformer, too small on the PCB Include the PCB in the safety review; add slots under the part

Why Core Material Also Matters

The insulation system sits on top of the core. Nanocrystalline and amorphous cores conduct and must be treated as a conductive part; Mn-Zn ferrite is insulating in bulk but its surface can become conductive when coated, and its mechanical tolerance affects how much margin space the winding has. Shaanxi SiRui Technology supplies coated and uncoated cores with documented coating thickness and breakdown voltage, so the barrier calculation can be closed with real numbers.

Related reading: Insulation class and temperature rise · Core coating comparison · Isolation transformer selection

About Shaanxi SiRui Technology Co., Ltd.
Custom transformers and inductors built to IEC 62368-1, 60601-1 and 61558 requirements, with creepage/clearance documentation supplied per part number.
Siri Yuan, Sales Manager · Email: sales@sirui-tech.com · Web: www.sirui-tech.com
No. 2555, Chanba Avenue, Chanba Ecological Zone, Xi’an, Shaanxi Province