Sirui-Tech logo Sirui-Tech

Incoterms Decide Who Owns the Risk, Not Just Who Pays

Most purchase-order disputes on magnetic components are not about price or quality — they are about the point at which risk transfers and who is responsible for a shipment that arrives damaged or delayed. Incoterms 2020 answers those questions precisely, and the choice of term changes the real cost of the goods by 5–15 % once freight, insurance, duty, and clearing are included.

This note covers the terms that matter for wound components, their weight and fragility, and the specific traps.

The Four Terms Buyers Actually Use

Incoterms comparison for magnetic components
Term Seller delivers Buyer pays Risk transfers Typical use
EXW At seller’s factory, not loaded Everything after the factory gate At the factory Buyer has own forwarder and China presence
FOB (port) On board the vessel at origin port Ocean freight, insurance, import duty, destination charges When cargo is on board Most common for containerized components
CIF On board plus freight and minimum insurance to destination port Import duty, destination charges, inland delivery On board (same as FOB) Buyer wants a landed port price
DDP At buyer’s door, duty paid Nothing further At destination Small shipments, samples, e-commerce-like flows

The critical point: under CIF the seller arranges freight and insurance but risk still transfers at the origin port. Buyers who assume CIF means “risk until my door” discover otherwise when cargo is damaged mid-ocean.

What Changes for Heavy, Fragile Cargo

Choosing a Term Without Regret

For repeat container shipments, FOB with a nominated forwarder is usually the most controllable: you see the freight cost, you choose the carrier, and the risk boundary is unambiguous. For samples and small lots, DDP is convenient but hides the duty; ask for the HS code and the duty amount even when you are not paying it. For first orders from a new supplier, EXW plus a trusted forwarder gives maximum control at the cost of more work.

What to Write in the PO

  1. Incoterm with the named place (e.g. “FOB Shanghai”, not just “FOB”).
  2. Incoterms version (2020).
  3. Packaging and pallet specification, including ISPM 15.
  4. HS code and country of origin, for duty estimation.
  5. Inspection point and who bears the cost of a third-party inspection.
  6. Document requirements: commercial invoice, packing list, certificate of origin, test reports.

Related reading

We ship FOB Shanghai and CIF to nominated ports, provide the HS code and origin documents with every shipment, and pack to ISPM 15 on request. Ask the Magnetic Core export team for a landed-cost sheet at sales@sirui-tech.com.