Three Quotes, Three Different Parts
When three suppliers quote the same drawing at 1.08, 1.24 and 1.45, the instinct is to treat the lowest as best value and the highest as overpriced. In most cases the three are not the same part: they differ in core grade, insulation system, test scope, tolerance, and what is included in the price. Normalising the quotes is a 20-minute exercise that prevents an 18-month problem.
The Comparison Matrix
| Line | Why it changes the price |
|---|---|
| Core grade and supplier | A lower-loss grade or a different manufacturer changes both cost and loss. If the grade is unnamed, the cheapest available will be used |
| Wire type and insulation class | Class B to F is 8–15 %; triple insulated wire costs more than enamelled plus tape |
| Insulation system reference | A UL-recognised system costs more than “we build to Class F” |
| Tolerance on inductance | A 5 % window means grading or trimming; a 10 % window may mean none |
| Leakage inductance control | Interleaving or a specified construction adds labour |
| Test scope | 100 % hipot plus inductance on every unit is different from a sample per lot |
| First article included? | A priced-in FAI report is not free in either quote; check whether it is inside or outside |
| Tooling and programme | Whether the mould, the machine programme and the fixture are charged, and who owns them |
| MOQ and price breaks | A quote at 1,000 pcs is not comparable with a quote at 300 pcs |
| Incoterm and packing | EXW and DDP differ by freight, insurance and duty, not by manufacturing cost |
| Currency and validity | A quote in a currency without a validity date is not a price, it is an indication |
| Lead time basis | From order, from material arrival, or “typical”: three very different commitments |
The Four Normalisation Steps
- Rewrite the drawing before you compare. If the RFQ left the core grade or tolerance open, close it now and ask all three to re-quote against the closed version. Comparing open quotes is comparing intentions.
- Convert to landed cost at your door. Add freight, insurance, duty and clearing to every EXW or FOB quote, using the same forwarder and the same HS code assumption.
- Add the excluded items. Tooling, FAI, packaging upgrades, and the cost of the test scope that is missing from the cheap quote.
- Price the difference in test scope explicitly. If supplier A tests 100 % hipot and B samples, the difference is not margin — it is your incoming inspection. Either pay B to test, or budget the inspection yourself.
Three Patterns Worth Noticing
- The cheapest quote has no test scope. Common, and usually the reason it is cheapest. On safety-critical parts this is not a saving.
- The middle quote is the incumbent’s second source. A supplier trying to win a share often quotes honestly and holds it; a supplier quoting far below its own cost will find a reason to raise the price at the second order.
- The expensive quote includes something you asked for and forgot. Check the FAI, the material declarations and the 100 % test before assuming a supplier is expensive.
What to Do After Choosing
Put the matrix in the purchase order as an attachment. It defines what you bought, and it converts the next conversation about a price increase into a conversation about a specific line that changed.
Related reading
- How to Write a Transformer RFQ
- Supplier Scorecard
- What Must Be on a Test Report
- Tariffs and Origin Rules
Every SiRui quotation arrives with the twelve lines above filled in, so the comparison is possible without a second round of emails. sales@sirui-tech.com.
