The 300-Piece Problem

Custom magnetics pricing is built around setup, not around material. A 300-piece order for a wound component carries the same winding programme, the same first-article inspection and often the same minimum core purchase as a 3,000-piece order, which is why the quoted unit price can look absurd at low volume. The buyer’s job is not to argue the price down; it is to move cost out of the order by changing what is being set up.

Where the Money Actually Goes at Low Volume

Typical cost structure, custom transformer
Element 300 pcs 3,000 pcs Comment
Core and wire 35–45 % 55–65 % Material is volume-invariant; its share rises as setup is spread
Winding and assembly labour 20–30 % 25–35 % Learning curve applies
Setup, programme, tooling amortisation 20–30 % 3–6 % The reason low volume is expensive
Test and inspection 8–12 % 3–6 % 100 % hipot is per-unit; first article is per-order

The lever with the largest range is setup. Everything below attacks it.

Seven Ways to Cut Low-Volume Cost

  1. Use a platform core and bobbin. A part built on a core size the supplier already runs needs no new mould and no new programme. Ask what platforms they have before the design is frozen.
  2. Accept a wider, honest tolerance. A 10 % inductance window instead of 5 % can remove a trimming or grading step. Only do this if the circuit analysis shows the wider window is genuinely safe.
  3. Buy the first article and the pilot lot together. One setup, one inspection report, two deliveries. This is the single most effective move for 100–1,000 pieces.
  4. Standardise on fewer part numbers. Three similar chokes on three drawings cost three setups; one choke used in three places costs one. This is a design decision, and it is often possible.
  5. Let the supplier choose the internal construction. Specify the electrical and mechanical envelope, not the winding pattern, unless the parasitics require it. Internal freedom is where a supplier can reuse an existing programme.
  6. Order annual volume with scheduled releases. Commit to the year, call off quarterly. The supplier amortises setup across the commitment, and your inventory stays low.
  7. Pay for the tooling separately. A visible tooling line item is often cheaper over the programme than tooling buried in a unit price, and it clarifies who owns the mould.

What Not to Do

Related reading

We quote low volume honestly, with the setup shown as a separate line so you can see what a larger release would remove. Send the annual forecast and the pilot quantity to sales@sirui-tech.com.